Automotive-Grade Radiator Die Casting Parts
Engineered for advanced vehicle thermal management, our premium radiator die casting parts deliver exceptional heat dissipation and structural reliability for modern powertrains, EV battery systems, and demanding under-the-hood applications.
To support crucial automotive lightweighting initiatives without compromising strength against road vibrations, these heat sinks are manufactured from automotive-grade aluminum alloys under the IATF16949 certification.
To withstand harsh driving environments, thermal cycling, and road salts, we offer a selection of highly protective surface finishes, including precision sandblasting, robust powder coating, and corrosion-resistant anodizing.
Precision Tooling for Automotive OEMs
The intricate cooling fins and exact geometries required for optimal fluid dynamics and engine cooling are achieved through mold engineering. Strictly adhering to international HASCO, DME, and MISUMI standards, we construct highly efficient 4-cavity molds designed for the high-volume precision demanded by automotive OEMs.
By utilizing Dievar and H13 steel for the inserts, we guarantee a mold surface hardness above HRC45. This ensures exceptional tooling longevity and zero-defect consistency across massive automotive production runs.
We offer an accessible MOQ of just 1 set for prototyping and testing phases. You can expect rapid turnarounds with mold T1 samples ready in 3 to 10 weeks, followed by an agile mass production lead time of 2 to 5 weeks, depending on your order volume.
Product Information
| Item | Details |
|---|---|
| Material | ADC12, A360, AlSi9Cu3 (A380) |
| Surface Finish | Sandblasting, powder coating, anodizing |
Mold Parameter
| Item | Details |
|---|---|
| Mold Base Material | LKM C50, P20, cast iron |
| Mold Standards | HASCO, DME, MISUMI |
| Surface Hardness | Above HRC45 |
| Insert Material | Dievar, H13 |
| Cavities | 4 cavities |
| MOQ | 1 set |
| Mold Lead Time | T1 sample, about 3–10 weeks, according to mold requirement |
| Production Lead Time | 2–5 weeks, according to order quantity |
| Mold Payment Term | 50% T/T deposit with PO, balance 50% T/T after sample approval |
| Products Payment Term | 30% T/T deposit with PO, balance 70% T/T before shipment |
| Port of Loading | Ningbo or Shanghai port |







